Herbert Leopold GABRYŚ
Power industry in Poland in 2017 ... basing upon the results for 2016 and not only
Jerzy RYCHLAK, Marek KOMARZYNIEC, Alojzy WOLC
Acceptance tests of generating units before connection to a network and during their subsequent work in a power system in the light of the EU Regulation (EC) 2016/631 requirements
Jerzy NOWAK
Communication networks according to the IEC61850 standard in a 400/220 kV substation secondary systems
BIULETYN PRO NOVUM
Jerzy TRZESZCZYŃSKI, Adrian SOBCZYSZYN, Kamil STASZAŁEK, Radosław STANEK, Sławomir RAJCA
Diagnostics of long time operated power units planned for flexible operation
Radosław STANEK, Jerzy TRZESZCZYŃSKI
Pro Novum experience in performing diagnostic supervision of BB-1150 and OP-650 boilers heating surfaces based on risk analysis
Krzysztof BRUNNÉ, Kamil STASZAŁEK, Przemysław SYTY
Special testing of long operated steam boiler drums
Wojciech BRUNNÉ
Vibrations of double-reheat steam pipings of power units working in regulation. Causes and prevention methods
AKADEMIA ENERGETYKI
Bogumił DUDEK
Modernization of live overhead power lines